Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Ali, F, Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(02), 178-89.

Griffin, B and Yang, J (2013) Design and analysis of a novel earpiece-less eyeglass frame. Journal of Engineering, Design and Technology, 11(02), 158-77.

Khalaf, A B, Hamam, Y, Alayli, Y and Djouani, K (2013) The effect of maintenance on the survival of medical equipment. Journal of Engineering, Design and Technology, 11(02), 142-57.

Mathews, M (2013) BIM collaboration in student architectural technologist learning. Journal of Engineering, Design and Technology, 11(02), 190-206.

Vinodh, S, Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(02), 129-41.

  • Type: Journal Article
  • Keywords: 5S and leanness; Lean production; Value stream mapping; Waste elimination
  • ISBN/ISSN: 1726-0531
  • URL: https://doi.org/10.1108/JEDT-01-2010-0007
  • Abstract:
    Purpose – This paper aims to explore the practical feasibility of deploying value stream mapping (VSM) for enabling lean manufacturing. Design/methodology/approach – The literature on lean manufacturing and VSM has been reviewed. VSM has been selected as a technique for solving the problem existing in the case organization. The current state map has been developed after making necessary observations and calculations. Then various improvement proposals have been identified and the future state map has been developed. The simulation approach has been used for validating performance improvements. The practicality of the approach has been validated. Findings – Two kinds of validation are being conducted in the case organization using questionnaire based approach. In the first stage, the practical receptivity of deploying the proposals has been gathered from the executives. In the second stage, statistical validation has been performed. Research limitations/implications – VSM has been applied for solving the problem in the case organisation. But the organisation has implemented world class strategies such as ISO quality management system and total quality management. Hence, the experiences gained by the conduct of this implementation study are feasible and deployable in similar organisations. Practical implications – In order to acquire lean characteristics, modern organisations are focussed on the implementation of various lean tools/techniques. The results of the implementation study indicated significant improvement in lean characteristics. Originality/value – The implementation study reported in this article is an original contribution of the authors which has been conducted in a typical industrial scenario. By the virtue of its research background and practical compatibility, the implementation study is considered to be highly valuable.

Zheng, P and Dai, G (2013) A comparative study on static properties of a three-main-truss and three-cable-plane cable-stayed bridge. Journal of Engineering, Design and Technology, 11(02), 207-20.